Altay Yenilebilir Enerji Üretim ve Depolama A.Ş., whose shares are fully owned by our Company, a contract has been signed with a domestic company for the construction, commissioning and investment processes of a 14.9 mW Solar Power Plant (SPP) for self-consumption and investment purposes. The area where the 7 mW SPP will be installed is located in Antalya province and the area where the 7.9 mW SPP will be installed is located in Nevşehir Province, and it is estimated that it will be put into operation in the first quarter of 2026.

Respectfully announced to the public.

This statement has been translated into English for informational purposes. In case of a discrepancy between the Turkish and the English versions of this disclosure statement, the Turkish version shall prevail.

İlgili Şirketler
[]
İlgili Fonlar
[]
Türkçe
Özel Durum Açıklaması (Genel)
Yapılan Açıklama Güncelleme mi?
Hayır (No)
Yapılan Açıklama Düzeltme mi?
Hayır (No)
Konuya İlişkin Daha Önce Yapılan Açıklamanın Tarihi
-
Yapılan Açıklama Ertelenmiş Bir Açıklama mı?
Hayır (No)
Bildirim İçeriği
Açıklamalar

Paylarının tamamı Şirketimize ait olan Altay Yenilebilir Enerji Üretim ve Depolama A.Ş.`nin uzun vadeli planları kapsamında öz tüketim ve yatırım amaçlı 14,9 mW Güneş Enerji Santralinin (GES) yapımı, işletmeye alınması ve yatırım süreçleri için yurt içi yerleşik bir firma ile sözleşme imzalanmıştır. 7 mW GES`in kurulacağı alan Antalya İlinde ve 7.9 mW GES`in kurulacağı alan Nevşehir İlinde yer almakta olup, tahmini olarak 2026 yılı ilk çeyreğinde işletmeye geçmesi öngörülmektedir. 

Kamuoyu ve yatırımcılarımız bilgisine sunarız.

Saygılarımızla,

İşbu açıklamamızın İngilizce çevirisi ekte yer almakta olup, açıklama metinlerinde herhangi bir farklılık olması durumunda, Türkçe açıklama esas kabul edilecektir.